Project management: Difference between revisions

From Risk Engineering
Created page with "{{DISPLAYTITLE:Project Management}} '''<big>This page is under construction ...</big>''' ''See also Project Execution, Project Development, Project Definition, Project Delivery Methods, Project Life Cycle and Phase Models.'' ''See also Program Management in Civil Engineering, Civil Engineering Projects, Management control, Management plans and sub-plans.'' {{ProjectDeliverySpine}} == Basic considerations == Project management is the..."
 
roject management
Line 76: Line 76:
* [[Management plans and sub-plans]]
* [[Management plans and sub-plans]]
* [[Project stakeholder]]
* [[Project stakeholder]]


== Notes ==
== Notes ==

Revision as of 18:09, 19 January 2026

This page is under construction ...

See also Project Execution, Project Development, Project Definition, Project Delivery Methods, Project Life Cycle and Phase Models. See also Program Management in Civil Engineering, Civil Engineering Projects, Management control, Management plans and sub-plans.




Basic considerations

Project management is the disciplined application of knowledge, methods, tools, and controls to project activities in order to produce defined deliverables and outcomes under constraint.

For RiskWiki, project management in civil engineering is inseparable from:

  • managing uncertainty and risk,
  • maintaining integrity of design and requirements through delivery,
  • and operating within contractual, regulatory, and stakeholder environments.

Top of current page

Semantic, Epistemic and Logical frameworks

(Under construction.)

Semantic framework

Common confusions that cause failures in practice:

  • “project management” vs “project controls” vs “governance”
  • requirements vs scope vs specifications
  • planning vs development vs execution
  • commercial scope splits vs legal responsibility (e.g., engineer-of-record obligations)

Epistemic framework

Project management exists because uncertainty cannot be eliminated before commitment. A core task is to identify which uncertainties must be reduced (retired) and which will be carried as managed risks.

Logical framework

A practical framing: 1. Define objectives, requirements, and constraints (definition). 2. Develop feasible designs, interfaces, packages, and baselines (development). 3. Execute work under integrated control systems (execution). 4. Verify and achieve acceptance/turnover (startup/commissioning).

Top of current page

Practice frameworks

(Under construction.)

This page should summarize and link to:

  • PMI / ISO / ASCE practice concepts (definitions, process groups, knowledge areas)
  • civil-engineering project controls (scope, schedule, cost, risk, quality, configuration)
  • agency programmatic requirements (FTA, FRA, DOE, USACE, etc.)

Top of current page

Interfaces to risk management

Project management provides the control architecture that makes risk management real:

  • governance and decision rights (“who defines acceptable?”)
  • change control (scope/spec/design changes)
  • risk identification, response planning, and risk funding (contingency / reserves)
  • stakeholder and interface management

Top of current page

Working definition of the term

Project management

Project management is the integrated set of leadership and control activities used to plan, coordinate, and govern project definition, development, and execution so that required outcomes are achieved within constraints.

Top of current page

See also


Notes

(Under construction.)

References

(Under construction.)