<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://riskengineering.org/index.php?action=history&amp;feed=atom&amp;title=Project_Delivery_Methods</id>
	<title>Project Delivery Methods - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://riskengineering.org/index.php?action=history&amp;feed=atom&amp;title=Project_Delivery_Methods"/>
	<link rel="alternate" type="text/html" href="https://riskengineering.org/index.php?title=Project_Delivery_Methods&amp;action=history"/>
	<updated>2026-09-15T08:54:15Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.3</generator>
	<entry>
		<id>https://riskengineering.org/index.php?title=Project_Delivery_Methods&amp;diff=266&amp;oldid=prev</id>
		<title>Pooyan: Project Delivery Methods</title>
		<link rel="alternate" type="text/html" href="https://riskengineering.org/index.php?title=Project_Delivery_Methods&amp;diff=266&amp;oldid=prev"/>
		<updated>2026-01-19T15:32:45Z</updated>

		<summary type="html">&lt;p&gt;Project Delivery Methods&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;&amp;lt;big&amp;gt;This page is under construction ...&amp;lt;/big&amp;gt;&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
&amp;#039;&amp;#039;See also [[Project_Definition|Project Definition]], [[Project_Development|Project Development]], [[Project_Execution|Project Execution]], [[Project_Life_Cycle_and_Phase_Models|Project Life Cycle and Phase Models]].&amp;#039;&amp;#039;&lt;br /&gt;
&amp;#039;&amp;#039;See also [[Project_stakeholder|Project stakeholder]], [[Management_control|Management control]], [[Civil_Engineering_Projects|Civil Engineering Projects]] ...&amp;#039;&amp;#039;&lt;br /&gt;
&lt;br /&gt;
== Basic considerations ==&lt;br /&gt;
A &amp;#039;&amp;#039;project delivery method&amp;#039;&amp;#039; is the integrated contracting and organizational approach used to finance, design, procure, construct, and transition a project to acceptance (and sometimes operations).&lt;br /&gt;
&lt;br /&gt;
Delivery methods matter in RiskWiki because they:&lt;br /&gt;
* allocate uncertainty and risk among stakeholders (through contracts),&lt;br /&gt;
* determine who controls which artifacts (requirements, designs, specifications),&lt;br /&gt;
* affect the feasibility boundary between conceptual and detailed design,&lt;br /&gt;
* shape interfaces (and therefore interface risk),&lt;br /&gt;
* govern how change is priced, approved, and implemented.&lt;br /&gt;
&lt;br /&gt;
[[#top|Top of current page]]&lt;br /&gt;
&lt;br /&gt;
== Semantic, Epistemic and Logical frameworks ==&lt;br /&gt;
&amp;#039;&amp;#039;(Under construction)&amp;#039;&amp;#039;&lt;br /&gt;
&lt;br /&gt;
=== Semantic framework ===&lt;br /&gt;
Common semantic confusion:&lt;br /&gt;
* delivery method vs procurement method vs contracting strategy (related but not identical),&lt;br /&gt;
* treating “design-build” as a single uniform model (it contains many variants),&lt;br /&gt;
* confusing commercial scope splits with legal responsibility (e.g., engineer-of-record obligations).&lt;br /&gt;
&lt;br /&gt;
Working distinction:&lt;br /&gt;
* Delivery method is the combined set of roles, contract structures, and decision rights used to deliver the facility.&lt;br /&gt;
&lt;br /&gt;
=== Epistemic framework ===&lt;br /&gt;
Delivery methods shift which party is responsible for retiring which uncertainties (e.g., investigations, interface definition, constructability, means-and-methods, performance verification).&lt;br /&gt;
This reshapes:&lt;br /&gt;
* the project’s risk profile,&lt;br /&gt;
* the timing of risk retirement,&lt;br /&gt;
* and the governance controls needed.&lt;br /&gt;
&lt;br /&gt;
=== Logical framework ===&lt;br /&gt;
A delivery method is a structured allocation of:&lt;br /&gt;
* responsibilities,&lt;br /&gt;
* authority,&lt;br /&gt;
* interfaces,&lt;br /&gt;
* and risk-bearing capacity&lt;br /&gt;
among stakeholders.&lt;br /&gt;
&lt;br /&gt;
Contracts are a key mechanism for memorializing that allocation.&lt;br /&gt;
&lt;br /&gt;
[[#top|Top of current page]]&lt;br /&gt;
&lt;br /&gt;
== Common delivery methods (working list) ==&lt;br /&gt;
(Under construction.)&lt;br /&gt;
&lt;br /&gt;
Typical civil-engineering delivery methods include:&lt;br /&gt;
* Design–Bid–Build (DBB)&lt;br /&gt;
* Design–Build (DB)&lt;br /&gt;
* Construction Manager at Risk (CMAR)&lt;br /&gt;
* Construction Manager / General Contractor (CM/GC)&lt;br /&gt;
* Engineering, Procurement, Construction (EPC) (more common in industrial domains)&lt;br /&gt;
* Public–Private Partnership (P3 / PPP) (many variants)&lt;br /&gt;
&lt;br /&gt;
[[#top|Top of current page]]&lt;br /&gt;
&lt;br /&gt;
== Delivery methods and the conceptual vs detailed design split ==&lt;br /&gt;
In many delivery environments, design responsibility is split into two broad components:&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Conceptual design&amp;#039;&amp;#039;&amp;#039; (often owner/owner’s agent): expresses requirements and a solution hypothesis.&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Detailed design&amp;#039;&amp;#039;&amp;#039; (often contractor’s design team): produces constructible details.&lt;br /&gt;
&lt;br /&gt;
A practical demarcation concept:&lt;br /&gt;
* If a design element’s feasibility is not yet demonstrated (technical / regulatory / constructability), it should be treated as a development risk rather than an execution assumption.&lt;br /&gt;
&lt;br /&gt;
[[#top|Top of current page]]&lt;br /&gt;
&lt;br /&gt;
== Typical role allocation (illustrative) ==&lt;br /&gt;
&amp;#039;&amp;#039;(Illustrative only; actual allocations vary by law, agency policy, and contract language.)&amp;#039;&amp;#039;&lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot;&lt;br /&gt;
! Delivery method !! Owner/sponsor role !! Designer role !! Builder role !! Typical risk/uncertainty implications&lt;br /&gt;
|-&lt;br /&gt;
| DBB || Defines requirements; holds design contracts || Designs for owner || Builds to completed design || Owner retains more design integration risk; contractor retains means/methods; interfaces often at contract boundaries&lt;br /&gt;
|-&lt;br /&gt;
| DB || Defines performance/requirements; reviews compliance || Designer is often under DB entity || DB entity integrates design + build || Integration shifts toward DB entity; owner retains requirement clarity risk; feasibility depends on quality of conceptual definition&lt;br /&gt;
|-&lt;br /&gt;
| CMAR || Defines requirements; holds design contract; CM provides precon services || Designs for owner || CM holds trade contracts and cost/schedule commitments || Early constructability input can reduce development uncertainty; change and interface management becomes central&lt;br /&gt;
|-&lt;br /&gt;
| CM/GC || Defines requirements; holds design contract; negotiates with CM/GC || Designs for owner with CM/GC input || CM/GC constructs (often with negotiated pricing) || Enables earlier feasibility testing and risk retirement; requires disciplined governance to avoid scope drift&lt;br /&gt;
|-&lt;br /&gt;
| P3 / PPP (variant) || Procures outcomes; governs performance || Often under private consortium || Often under private consortium || Transfers some long-term performance/financing risk; requires strong definition of acceptance and operations requirements&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
[[#top|Top of current page]]&lt;br /&gt;
&lt;br /&gt;
== Interfaces to uncertainty and risk management ==&lt;br /&gt;
Delivery methods influence:&lt;br /&gt;
* what counts as a “requirement risk” vs “design risk” vs “construction risk”,&lt;br /&gt;
* who funds which risks (contingency vs allowances vs management reserve),&lt;br /&gt;
* who owns interface uncertainty (package boundaries),&lt;br /&gt;
* how claims/disputes arise and are resolved.&lt;br /&gt;
&lt;br /&gt;
A useful analytical exercise:&lt;br /&gt;
* pick one contract package with difficult interfaces and map (1) requirements, (2) design artifacts, (3) procurement packages, (4) construction tasks, and (5) startup/acceptance steps—then identify where feasibility can break.&lt;br /&gt;
&lt;br /&gt;
[[#top|Top of current page]]&lt;br /&gt;
&lt;br /&gt;
== Working definition of the term ==&lt;br /&gt;
Project delivery method&lt;br /&gt;
:A project delivery method is the integrated set of contracting structures, organizational roles, procurement approach, and decision rights used to define, develop, execute, and achieve acceptance of a project, including the allocation of uncertainty and risk among stakeholders.&lt;br /&gt;
&lt;br /&gt;
[[#top|Top of current page]]&lt;br /&gt;
&lt;br /&gt;
== Limitations of the definition ==&lt;br /&gt;
(Under construction.)&lt;br /&gt;
* Terminology and legal meanings vary across jurisdictions and agencies.&lt;br /&gt;
* “Delivery method” is frequently used as shorthand for only the procurement method; RiskWiki uses a broader meaning including governance and role allocation.&lt;br /&gt;
&lt;br /&gt;
== Beneficial Outcomes ==&lt;br /&gt;
(Under construction.)&lt;br /&gt;
Clear delivery-method selection and documentation improves:&lt;br /&gt;
* alignment of responsibilities with capability,&lt;br /&gt;
* transparency of risk allocation,&lt;br /&gt;
* feasibility of schedule and cost commitments,&lt;br /&gt;
* interface control and claims avoidance.&lt;br /&gt;
&lt;br /&gt;
== See also ==&lt;br /&gt;
* [[Project_Definition|Project Definition]]&lt;br /&gt;
* [[Project_Development|Project Development]]&lt;br /&gt;
* [[Project_Execution|Project Execution]]&lt;br /&gt;
* [[Project_Life_Cycle_and_Phase_Models|Project Life Cycle and Phase Models]]&lt;br /&gt;
* [[Project_stakeholder|Project stakeholder]]&lt;br /&gt;
* [[Management_control|Management control]]&lt;br /&gt;
&lt;br /&gt;
== Learning Outcomes ==&lt;br /&gt;
(Under construction.)&lt;br /&gt;
The reader should be able to:&lt;br /&gt;
* describe how delivery methods allocate uncertainty among parties,&lt;br /&gt;
* explain conceptual vs detailed design as a delivery-method boundary,&lt;br /&gt;
* identify delivery-method-driven interface risks.&lt;br /&gt;
&lt;br /&gt;
== Notes ==&lt;br /&gt;
(Under construction.)&lt;br /&gt;
&lt;br /&gt;
== References ==&lt;br /&gt;
(Under construction.)&lt;br /&gt;
&lt;br /&gt;
[[Category:Definition]]&lt;/div&gt;</summary>